fbpx

Guildford Mall Summer Seating

Guildford Mall Summer Seating

Guildford Mall Summer Seating

Guildford Mall Summer Seating is a two-year outdoor placemaking installation designed to create a sculptural, community-focused gathering space. In 2024, MJY Fabrication worked with Massivart (design) and Charlemain Production Ltd (project management) to refine, engineer, and fabricate the original concept. In 2025, MJY delivered a full turnkey refresh, designing new graphics, re-wrapping, and reinstalling the activation based on updated mall direction.

Across both years, the activation aimed to create a vibrant summer focal point that encouraged visitors to gather, interact, and share the space.

The Challenge

Crafting a Sculptural, Social-Ready Feature for High Public Use

Guildford Town Centre wanted a visual landmark that would:

  • Bring mall-goers together in a shared community space
  • Enhance the outdoor area with colour, sculptural presence, and summer energy
  • Generate public draw, social content, and high engagement
  • Improve dwell time and overall visitor experience

The challenge was creating something both playful and functional, durable enough for heavy public use, visually bold, and installable within tight timelines.

Client:

Guildford Town Centre / JLL

Location:

Surrey, BC

Timeline:

Summer 2024 & Summer 2025

Cost:

$55,000 (2024) + $32,000 (2025)

Scope:

Outdoor Placemaking Installation

The Approach

Balancing Creative Vision With Buildable, High-Performance Solutions

2024 – Collaboration with Massivart & Charlemain

Massivart provided the creative direction, while Charlemain managed coordination. MJY refined the concept to ensure it could be built and used safely, completing:

  • Detailed site measurements
  • Engineering adjustments for comfort, durability, and fit
  • Fabrication planning and structural reinforcement

This collaborative approach balanced creative intent with real-world performance.

2025 – MJY Turnkey Redesign

For the refresh, MJY provided a full design-to-install solution:

  • New MJY-created graphics based on a concept image
  • Full re-wrap, repair, and re-lamination of existing components
  • Project management from pick-up to install
  • Early-morning installation and client walk-through

This iteration showcased MJY’s ability to deliver efficient, cohesive turnkey activations.

The Build

Precision-Fabricated for Durability, Efficiency, and Fast Installation

2024

MJY fabricated sculptural bench sections and cylinder seats using CNC-cut joinery and exterior-grade materials. Components were designed for:

  • Public durability
  • Clean vinyl wrapping
  • Efficient transport and installation

Install required precise coordination with early-morning timelines and multi-step sequencing.

2025

The refresh included:

  • Vinyl removal and surface repairs
  • Updated graphics package
  • Exterior-grade re-wrap
  • Improved install sequencing for faster placement

Reusing the original structure maximized sustainability while delivering a fresh, mall-specific visual identity.

Key Takeaways

Guildford Mall Summer Seating shows the power of placemaking, how sculptural, intentional design can transform a standard mall area into a social hub. It also highlights MJY’s ability to support both collaborative builds and full turnkey redesigns, delivering durable, engaging installations that connect people to place.

Project Gallery

What experience do you want to create?